Client:
City of Folsom, CA
Completed:
2014-2017
Services:
Construction Management; Utility Management & Condition Assessment; Wastewater
Water Works Engineers provided design services for the Folsom Plan Area Easton Valley Parkway Sewer Lift Station and Forcemain project. This included design of a 2.5 mgd duplex wet pit / dry pit submersible pump station with provisions for future expansion, site improvements, the addition of a new MCC/SCADA/electrical building, odor control, and bypass pumping connections. The 3,000+ linear foot dual forcemains required two creek crossings and a 300 linear foot auger bore and jack crossing of Highway 50 (eight lanes of traffic). Water Works also provided assistance with permitting and right-of-way, encroachment, and easement procurement.